Twister T2

prices excl. tax

Twister T2S Trimmer, Standard, Euro, Packaged * Does Not Include Hopper 02-10021A

€ 13’971.38

Twister T2 Vacuum (packaged) 1700cfm 2HP Euro 23-0117E-00-P

€ 1’420.88

T2 Trim Saver, Euro, CS-18E Coming Soon

€ 4’367.25

Rails, Single, T2 24-0400-00-P

€ 551.25

T2 Triple Rails 24-9036

€ 2’913.75

T2 Quad Rails 24-9033-00

€ 3’174.75

T2 Guard Upgrade Kit 02-10014A

€ 1’492.88

Standard Tumbler Assy T2, Ss-ep-ad 50 Slot Packaged 24-0131-03-P

€ 1’236.38

Narrow Tumbler Assy T2, Ss-ep-ad 62 Slot Packaged 24-0003-00-P

€ 1’236.38

Twister Rails Extension 24-0401-01-P

€ 286.88

Standard Feed Conveyor Assembly, For Use With Single/tandem T2, T4 Systems Without Rails (2 Parts) 26-0001E-01

€ 3’810.38

Standard Qc Conveyor Assembly, For Use With All T2 Systems And T4 Systems Without Rails (2 Parts) 26-0002E-01

€ 4’019.63

Conveyor Leg Extension Kit 27-0006

€ 324.00

Extended Height Feed Conveyor Assy, For Use With T4 Rails And T2 Triple/quad Rails (2 Parts) - 2200v2 26-0102E-00

€ 4’215.38

Conveyor, Feed, Stainless Steel, T2/T4 26-10018A

€ 13’554.00

Conveyor, Qc, Stainless Steel, T2/T4 26-10019A

€ 16’265.25

Hopper Assy T2 - Needed If No Conveyor 24-0135-00

€ 225.00

T2 Trimming Systems - does not include Hopper

Single T2 Trimming System with Leaf Collector does not include Hopper 02-10021A 23-0117E-00-P

€ 14’776.56

Tandem T2 Trimming System with Leaf Collector (2) 02-10021A (2) 23-0117E-00-P 24-0400-00-P 24-0401-01-P

€ 31’623.75

Triple T2 Trimming System with Leaf Collector (3) 02-10021A (3) 23-0117E-00-P 24-9036

€ 49’090.50

Quad T2 Trimming System with Leaf Collector (4) 02-10021A (4) 23-0117E-00-P 24-9033-00

€ 64’742.63

Ultimate Tandem T2 Trimming System with Leaf Collectors (2) 02-10021A

€ 66’035.25

Ultimate Triple T2 Trimming System with Leaf Collectors (3) 02-10021A

€ 107’925.75

Ultimate Quad T2 Trimming System with Leaf Collectors (4) 02-10021A

€ 125’330.63

Stärke in Zahlen

Das firmeneigene Einzelstück-Flow-Design von Twister ermöglicht eine kontinuierliche Laufzeit ohne Unterbrechungen oder Ausfallzeiten.

Fügen Sie Förderbänder hinzu, um während des gesamten Schneidevorgangs eine fortlaufende Qualitätskontrolle durchzuführen. Laufen Sie in Konfigurationen bis zu 4 hintereinander, für eine Gesamtproduktionsgeschwindigkeit von bis zu 160 lbs / h!

Beginnen Sie mit einem, fügen Sie einen zweiten oder dritten hinzu, und wenn Sie bereit sind, schieben Sie einen vierten ein. Keine zusätzliche Arbeit erforderlich!